Workshop
1#-Building Integrated Research and Development Building: mainly used for product research and development,Product quality inspection,Administrative management services, guest reception, multi-functional conference rooms,Big HealthProduct display, staff dining and staff cultural and recreational activities.R & D ComplexIntegrated R & D Buildingfor fivelayer frame structure,One layerThe southwest area is a canteen.andGuest ReceptionMeeting restaurant, southeastBig Health ProductsShowHalland multimedia training centres;IILayerfor the office areaand multi-functional conference rooms;LayerStaff cultural and recreational activitiesLending books and materials,StaffFitness exercise, etc.; fourlayer for employeesDormitory andGuestLiveHostel; five layers for product technologyResearchhair center,Product quality inspection center; A total of 7612 ㎡, equipped with 2DepartmentPassenger lift.
Building 2 (Class C Factory Building) External Preparation Complex, with a total construction area of 16052 ㎡. four-layer frame structure; The first floor has a construction area of 4013 ㎡, and fire-fighting blocking walls are designed on the east and south sides to form an L-corridor. Elevators for people flow passage and elevators for logistics transfer are respectively installed. An auxiliary equipment room (equipped with cold water screw unit and pump machine, which are refrigeration auxiliary for air conditioning system) is built in the middle. The construction area of the L-corridor of fire-fighting blocking wall is 1133 ㎡. First floor northwestFace for external solution, tincture production workshop. There are solution and tincture line A production workshops and solution and tincture line B (hormone) workshops with a construction area of 2880 ㎡. The second floor building area is 4013 ㎡,For external use ointment, cream production workshop, built ointment, cream A line production workshop, ointment, cream B line (hormone) workshop. The three-storey building area is 4013 ㎡, which is a comprehensive warehouse for external preparations. The warehouse mainly storesZangFor the production of external preparationsRaw material,Accessories, packaging materials and finished productsAt the same time, there isClass D sampling control (purge) area. The total construction area of the four floors is 4013 ㎡, which is a spare warehouse for the development of external preparations.
Building 3# (Class Cwarehouse)The total construction area is 12000 ㎡, which is fourLayer frame junctionstructure;.The first floor has a construction area of 3000 ㎡, which is a spare production workshop for enterprises to develop oral preparations.The construction area of the second floor is 3000 ㎡, which isOral preparation standby finished product warehouse,Zang storageOral preparation finished product.The three-storey building area is 3000 ㎡, which isOral preparation standby medicine warehouse,Zang storage for productionMedicinal herbs for oral preparations.The four-story building area is 3000 ㎡, which isOral preparation spare packaging material warehouse,Storage Zang production with oral preparation package material.
Building 4#Extraction workshop ((Class C plant)):TotalThe construction area is8412㎡,ForFourlayer frame structure. One layer,The construction area is2103㎡,ForClass D clean area, mainly used for the collection of extracted herbal extracts, the drying and collection of extracts, and the sterilization, drying, crushing, and,Ethanol rectification areaWait.Second floorThe construction area is2103㎡,Mainly used for medicinal materialsExtraction, concentration, alcohol precipitation. RefinedWait. Three layersThe construction area is2103㎡Layer, Eastern District is the selection of medicinal materials, moistening medicine, cutting system,Dry and coarsely crushedWaitPieces production area, western area is high for pieces.Feeding area. FourLayerThe construction area is2103㎡ForMedicinal materials temporary storage warehouse.Building 4#Each floor hasVentilation, explosion-proof, and equipped with fire alarm devices and fire extinguishing devices and other facilities, in line with fire safety design.
5# maintenance room:TotalThe construction area is 367㎡, onelayer frame structure(layer high pressure6.5m),ForFull-automatic cartoning machine (DZH-150), full-automatic transparent film three-dimensional packaging machine (TMP-300E), open-loading and sealing machine (YJY-650), automatic filling and sealing machine (RGF-80Z-C), vacuum emulsifying mixer (TFZRJ-500L-Q),Purified water equipment(FSJ42X-3XB-2), full-automatic bottle unscrambling machine (LP200/800, LP120/630), linear filling and capping machine (YG12/8), filling and capping machine (XYG4/2/2), vertical self-adhesive labeling machine (including hot coding)(LT) and other production equipment provide maintenance operation guarantee.
6# pump house:The total construction area is 123㎡,Onelayer frame structure, is equippedA、Btwo groups4 circulating pumps, groupedExternal use preparation,Extraction workshop conveyingCooling water,for steam heating processImplementationRapid cooling to meet the requirements of production process parameters,Reduce energy consumption and improveProductionAging and product quality.
7# boiler room: construction area of 140㎡, onelayer frame structure(layer high pressure7.5m), can be assembled 2T, 4T
One gas boiler each, for the extraction workshop, external preparation delivery and production of heat energy.
8# Class A tank farm: equipped1 10T ethanol storage tank and 2 2T ethanol storage tanks for the extraction workshopStorageThe solvent for the production process (ethanol) isExternal preparation productionConveying, reserve material (ethanol).
Other buildings andFacilities:The sewage treatment system is built just north of the production area, below the right of the dominant wind direction throughout the year.Grid well, catchment regulating pool,Combined air flotation sedimentation device,Dosing system,EGSB anaerobic tower,Waste water regulating tank,Blast device and sludge treatment system, etc.Facilities, can meet the treatment of sewage in the plant area (treatment capacity50tons/day) requirements. Cooling circulating water system300m³Water supply, square cross-flow combined low-temperature tower cooling method cooling, can meet the requirements of the extraction of circulating cooling water..